← All plants
HYDRO-DEMO-01VMR0017 v1.0 + ACM0002 v22.0greenfieldactive

Demo run-of-river plant

Credits issued1.537 t CO₂eevery record verified
Monitored emission reductions1.537 tBE 1.902 − PE 0 − LE 0.364 t
Net export17.349 MWh0.089 t CO₂e per MWh
Data coverage100.0%2 monitored periods

Registered design

Host countryUG
Capacity0.5 MW
Reservoirrun-of-river (no reservoir)
Reservoir emissionsNo new or enlarged reservoir (A_PJ = A_BL): PE_HP,y = 0
EF_grid,CM (VT0011)0.109606 t CO₂/MWh
Fuel COEF (TOOL03)3.2388 t CO₂/t fuel
Crediting period2026-01-01 → 2032-12-30
Validated by (VVB)0xE079E4f1deE110c43E3a94c9b313c149505156F2
Validation report0x140bc36b66a58ae460216da9b0a28a00924e7b2eecaf9ea0e6ac52153f8a713e
Design hash0xee688a1b509e57ddb0d5c9487b92057ceab410447d384c5d72bf36717b715af9

On-chain ledger

Monitoring records2 (2 verified)
Crediting year1
Net energy this year17.349 MWh
Unissued balance266 g CO₂e verified, carried toward the next kg credit
Record chain head0x1031120439d6e96308e617fa0e8387fb0bce012f8db6955272143dad9a066936
Last period ends2026-09-29 10:00 UTC
Operator0xD7D4789b59Ff215403519bA08DA384f89C95DA41

The next record must start after the last period and carries this ledger's sequence number, so a stale or replayed meter statement is refused on-chain. A VVB verification must sign the chain head of the records it covers.

Monitoring records

#PeriodEG_facilityBEPELEERStatusCoverageEvidence
12026-09-28 10:00 → 2026-09-29 10:00 UTC8.675 MWh0.951 t0 t0.182 t0.769 tverified (#0)100.0%HCS reportReproduce
02026-09-27 10:00 → 2026-09-28 10:00 UTC8.675 MWh0.951 t0 t0.182 t0.769 tverified (#0)100.0%HCS reportReproduce

Verifications

#RecordsDecisionMonitored ERDeductionIssuedVVBReport
00–1approved1.537 t0 t1.537 t0xE079E4f1deE110c43E3a94c9b313c149505156F2HCS report

Verification (VVB)

Records become credits only after an accredited VVB verifies them. Load the pending run to see each record re-derived from its HCS readings, with the registered design, the meter and its link in the on-chain record chain.